Just a quick update with more of the same tasks being whittled away at. Been planning and ordering more equipment to fill the shop while shipments arrive.
Hardware
Continued work on Steam Valve and potentiometer attachment brackets
Figured out spring issues and have tested part of the solution. Continuing to test and make improvements on that
Ash sample parts have arrived. Need to made adjustments and get them on sample unit for photos
Shop internet installed
Software
Incorporating Beta tester feedback.
Tasks for this week
Meet with the packaging design engineer to do more testing and finalize layout
Continue ordering shop tools and equipment
Wrap up patent review
Get powder coating parts out
Thanks,
Ross Ainsworth